Camp Billy Gibbons
Improvements 2013-2018

Over the past five years a lot of progress has been made in upgrading and repairing the facilities at Camp Billy Gibbons.  It has been estimated that over $300,000 has been raised and spent on various projects in the camp including electrical, sewage, water system, and buildings.  Here are a few photos as the camp looks in 2018 as they prepare for the summer camp season.  More projects are in the works including a climbing tower with zip lines, a fishing dock, metal storage containers.

New
                Dock
New Dock at Swimming Hole
Aquatic Area
New fencing along the waterfront
Looking Up From Blue Hole
Looking upstream from Blue Hole

Council Ring
No change at campfire ring
Blue Hole
No change at Blue Hole
Dam
Looking upstream at dam.  Note increase growth on dam.
Dining Hall
A lot of  juniper has been removed from the camp to open it up.
Dining Hall Porch
New windows in dining hall, handicap ramp and new ceiling above porch.
Office
New Clarence Horner Snack Bar and Trading Post at end of dining hall.
Trading Post
New Trading Post at end of dining hall.
Gee Lodge
Gee Lodge now has a covered porch on both sides plus roof and redone interior.
OA
                Ring from Bluff
Looking at the OA Ring from the bluff.
Latrine
New Latrines in some campsites.  Same pad and sinks.
Cowboy Action Range
New Cowboy Action Range

New Climbing Tower with Zip Lines. 
 
New Zip Line in Operation


New Shotgun Shooting Stations. They will be shooting off the bluff.

Learning a new skill.

We want to thank Robin Walker, Properties VP of Texas Trails Council, and Cliff Coan, District Training Chairman of Old Comanche Trail District, for providing these photos of the improvements made at Camp Billy Gibbons.  We want to thank Lauren Pulley for providing us photos of the climbing tower, the zip line, and the boats at the bottom right hand side of the page.

Return to Camp Billy Gibbons 

Return to Home Page