Over the past five
years a lot of progress has been made in upgrading and
repairing the facilities at Camp Billy Gibbons.
It has been estimated that over $300,000 has been
raised and spent on various projects in the camp
including electrical, sewage, water system, and
buildings. Here are a few photos as the camp
looks in 2018 as they prepare for the summer camp
season. More projects are in the works including
a climbing tower with
zip lines, a
fishing dock, metal storage containers. |
New Dock at Swimming Hole |
New fencing along the waterfront |
Looking upstream from Blue Hole |
No change at campfire ring |
No change at Blue Hole |
Looking upstream at dam. Note increase growth on dam. |
A lot of juniper has been removed from the camp to open it up. |
New windows in dining hall, handicap ramp and new ceiling above porch. |
New Clarence Horner Snack Bar and Trading Post at end of dining hall. |
New Trading Post at end of dining hall. |
Gee Lodge now has a covered porch on both sides plus roof and redone interior. |
Looking at the OA Ring from the bluff. |
New Latrines in some campsites. Same pad and sinks. |
New Cowboy Action Range |
New Climbing Tower with Zip Lines. |
New Zip Line in Operation |
New Shotgun Shooting Stations. They will be shooting off the bluff. |
Learning
a new skill.
|
We want to thank Robin Walker, Properties
VP of Texas Trails Council, and Cliff Coan, District
Training Chairman of Old Comanche Trail District,
for providing these photos of the improvements made
at Camp Billy Gibbons. We want to thank Lauren
Pulley for providing us photos of the climbing
tower, the zip line, and the boats at the bottom
right hand side of the page. Return to Camp Billy Gibbons Return to Home Page |